Charging and energy
Power that works where the grid does not
Solar-backed charging and battery swapping in cities and along corridors, depot charging for fleets, and the batteries and storage that make both dependable.
Three ways to charge
Match the charging to how the vehicle is used
Battery swap hubs
A rider pulls in, hands over a depleted pack and leaves with a charged one in under a minute. A cabinet holds several packs, charges them slowly and cheaply in the background, and reports each pack's status to a cloud dashboard.
- Typical cabinets hold from 5 to 16 packs
- Packs charge on a schedule that suits the power available
- Best where riders work long hours and cannot wait
Depot AC charging
Vehicles plug in when they park for the night. 7 kW to 22 kW AC points are the workhorse: inexpensive, simple and gentle on batteries. Smart scheduling keeps the site's peak demand within what the supply can deliver.
- One point can serve several vehicles overnight
- Open protocols for remote management
- Rated for outdoor use and Nigerian heat
DC fast charging
For vehicles that cannot wait, or for corridor stops, DC fast chargers deliver a substantial charge in the time of a break. They need more power and cost more, so we specify them only where the duty cycle demands it.
- Used as a top-up, with AC for the base load
- Connector standard must match the vehicle
- Often paired with on-site storage
Energy and batteries
Solar, storage and the battery's second life
Grid power in Nigeria can be intermittent. Charging that stops when the grid does is not a mobility service.
We design charging sites with solar generation and battery storage where they pay back, so vehicles charge from the sun in the day and from stored energy when the grid fails. Batteries that no longer meet vehicle standards still hold useful capacity, and our direction is to reuse them in stationary storage and then recycle them in Nigeria.
Solar generation
Canopies and rooftops over parking and swap hubs double as shade for equipment.
On-site storage
Batteries smooth demand and keep charging going through outages.
Second life and recycling
Reuse in stationary storage, then recover materials at end of life.
Planning tools
Size your charging before you talk to anyone
Two quick planning calculators. They give a first-pass size and a cost comparison to bring to a proper site survey. They are estimates, not designs or quotes.
Car or minibus depot
Assumptions you can change
Energy needed per day
drawn from supply, including charging losses
- AC points, one per vehicle (simplest) 20
- Fewest AC points (cars moved during the night) 4
- Planning supply cap (about 2.5 times the average load) 60 kW
- If every vehicle charged at once 140 kW
- Solar array for the chosen share 20.1 kWp
- Electric cost per km ₦43
- Petrol cost per km ₦136
- Monthly saving versus petrol ₦2.46m
Planning estimate only. It excludes capital cost, demand charges, standing charges and maintenance. The electricity cost is a placeholder, not a quoted tariff.
Motorcycle swap hub
Assumptions you can change
Energy needed per day
at the cabinet, including charging losses
- Swaps per day 30
- Cabinets needed 1
- Pack slots 12
- Packs in circulation (one per bike plus a cabinet set) 32
- Solar array for the chosen share 21.5 kWp
Planning estimate only. Assumes about 4.5 peak sun hours a day. Real sizing needs a site survey and the pack data for the chosen vehicle.
Site design
What we check before we build a charging site
- Supply. Whether the site has a three-phase connection, its capacity and its reliability.
- Heat. Chargers and swap cabinets have operating limits, so shade, ventilation and placement matter in Nigerian temperatures.
- Connectors. Whether vehicles use Type 2 and CCS2 or a different standard, confirmed before any equipment is ordered.
- Protocols. Open charge-point protocols, so equipment can be monitored and replaced without lock-in.
- Service. Spares and a local maintenance plan, because equipment that cannot be repaired locally does not stay in service.
- Security. Lighting, locking, fencing and metering suited to an unattended site.
Let's talk
Tell us what you need to move.
We will show you how to move it on electricity, with a costed plan, a delivery timeline and a monthly report you can stand behind.